Projects
2022
- October: Avecs Corporation – Processing of OBO Permits and MECO Energization of Globe Cell Site
- 1 – site
- October: ZTE Philippines Inc – Genset Pad Expansion for 3rd Telco DITO Telecommunity Cell Sites
- Bohol Area – 3 sites
- Leyte Area – 6 sites
- September: Prism Electrical Controls Corp. – Lightning Arrester Installation
- September: Xinchuan International Economic and Technological – Permanent Power Line Construction for 3rd Telco Dito Telecommunity Cell Sites
- Bohol Area – 13 sites
- August: Unity Digital Infrastructure – Grid Power Connection – Primary and Secondary Line Construction and Energization Cell Sites
- Bohol Area – 8 sites
- Cebu Area – 9 sites
- August: Teqnologix – Cable Laying and Splicing for Telecommunication Line Converge ICT
- Bohol Area – 4 sites
- June: ZTE Philippines Inc – Genset Pad Installation for 3rd Telco DITO Telecommunity Cell Sites
- Cebu Area – 3 sites
- Leyte Area – 5 sites
- Negros Area – 3 sites
- January: EBATECH – NGCP MAGAPIT SS: Provision of technical expertise for the supervision and supply of technicians for the electrical works at NGCP side of MAGAPIT interconnection
2021
- August: Frontier Tower Associates Philippines – Site Survey for Permanent Power and Permanent Power Application
- Cebu Area – 35 sites
- Leyte and Samar Area – 26 sites
- Bohol Area – 15 sites
- August: Jehan Corporation – PLDT Tech Refresh Talisay
- August: Jehan Corporation – PLDT Tech Refresh Tangub
- September 2019 International Pharmaceuticals Incorporated -Fire Protection System
Completed Projects
Tasks, initiatives or projects that we have completed based on client requirements. These projects could range from small tasks to large-scale initiatives.
Updating
- List of contents
- January – DOST Bohol – Supply of Power Generator Set
- January – ZTE Philippines Inc – O & M – Restoration Electrical Works
- Cebu – 9 sites
- Bohol – 2 sites
- February – Energy and Building Applications Technologies Corporation – CCLEX Supply of Manpower including Mobilization & Accommodation of 6 persons for 1 month
- March – Surigao State College of Technology – Supply and Delivery of Electrical Supplies – Solar Panels and Accessories
- March – One Commerce International Corporation – Globe RMS Site Survey Phase 4
- Cebu Area – 32 Sites
- Bohol Area – 3 Sites
- Leyte Area – 8 Sites
- Samar Area – 19 sites
- April – DTI Bohol – Renovation and Repair of Conference Room and Comfort Rooms
- April – One Commerce International Corporation – Globe RMS – Implementation Phase 3 – 103 sites
- April – IPI Bacolod – Proposed New Warehouse And Admin Building Ipi – bacolod; Supply/Installation Of Primary Line Construction, 3 Units-75kva Transformer Including Testing/Commissioning & Other Accessories To Complete The Scope For Permanent Power Supply
- April – Operation & Maintenance Technology Phils., Inc. – Installation of Exhaust Fan
- April – Unity Digital Infrastructure – Service Drop Cable Works
- Bohol – 2 sites
- Cebu – 8 sites
- June – Atlas Copco – Installation of Air Compressor G11FF WXI014475, and AirNet Piping works at Fenstra Widows and Doors
- June – TEQNOLOGIX – Cable Laying and Splicing for Telecommunication Line Converge ICT
- Bohol Area – 4 Sites
- August – Operation & Maintenance Technology Phils., Inc Supply of Manpower, Equipment and Tools Mobilization Demobilization for the installation ofRO system at Minebea Mitsumi
- October – DepEd Sudtunggan ES – Additional Repair and Renovation of Sudtunggan Elementary School
- October – DepEd Division of Lapu-Lapu – Conversion of Supply Room to GAD Room
- December – DepEd Division of Lapu-Lapu – Installation of Canopy and Construction of Concrete Fence
- February – One Commerce (Intl.) Corporation – RMS Site Survey
- Cebu – 87 Sites
- Leyte – 13 Sites
- Bohol – 17 Sites
- Siquijor – 1 Site
- Samar – 7 Site
- Biliran – 1 Site
- April – EBATECH – NGCP LAMAO SS – Provision of technical expertise for the supervision and supply of technicians for the electrical works at NGCP side of LAMAO interconnection
- April – EBATECH – NGCP LIMAY SS – Provision of technical expertise for the supervision and supply of technicians for the electrical works at NGCP side of LIMAY interconnection
- May – Energy and Building Applications Technologies Corporation – UPSI- 005 NGCP Ubay 69KV SS- Provision of technical expertise for the supervision and supply of technicians for the electrical works at NGCP side of UBAY 69KV Interconnection.
- June – Jehan Corporation – PLDT TNT Tech Refresh
- June – Jehan Corporation – PLDT Bais SF Tech Refresh
- June – Jehan Corporation – Tech Refresh Oroquieta
- June 2021 – International Pharmaceuticals Incorporated – Supply of Materials, Manpower, Supervision, Use of Tools and Equipments, P.P.E and Other Incidentals Necessary for Utilities and Process Lines for Pharmaceutical Building – Tingub Plant
- June – OneCommerce International Corporation – Globe RMS Implementation Phase 2
- Cebu Area – 54
- Bohol Area – 17
- Leyte Area – 12
- Samar Area – 6
- Biliran Area – 1
- June – Energy and Building Applications Technologies Corporation – NGCPs Villanueva 138kV UPSI Interconnection Electrical Works
- July – Energy and Building Applications Technologies Corporation – NGCP SAN MANUEL SS – Provision of technical expertise for the supervision and supply of technicians for the electrical works at NGCP side of SAN Manuel interconnection
- July – Energy and Building Applications Technologies Corporation – UPSI- 004 LIMAY BCCPP – Provision of technical expertise for the IDME Integrity Testing at Limay BCCPP in accordance to NGCP standards and compliance requirements.
- August – Big Blue Logistics Corporation – Lightning Arrester Installation
- August – OneCommerce International Corporation – Globe RMS Survey Site
- Leyte Area – 49 Sites
- Albay – 7 Sites
- Sorsogon – 2 Sites
- Masbate – 8 Sites
- Camarines Norte – 7 Sites
- Camarines Sur – 8 sites
- Siquijor Area – 2 Sites
- Bohol Area -14 Sites
- Cebu Area – 11 Sites
- Albay – 7 Sites
- Sorsogon – 2 Sites
- Masbate – 8 Sites
- Camarines Norte – 7 Sites
- Camarines Sur – 8 Sites
- Samar Area – 31 Sites
- Biliran Area – 3 Sites
- August – OneCommerce International Corporation – Globe RMS Site Survey Phase 3 – 147 sites
- September – International Pharmaceuticals Incorporated – Water Treatment System Piping
- September – InternationalPharmaceuticalsIncorporated – Overall Lightning Protection System
- September – Megawide Construction Corporation – Lightning Arrester Installation
- October – DTI BOHOL – Installation of Exhaust Fan
- November – Operation & Maintenance Technology Phils., Inc. – Air Compressor, Boiler Maintenance / Pen Maintenance, Gas Chroma, Pump Maintenance,AHU Maintenance
- November – Energy and Building Applications Technologies – Corporation – CCLEX-3rd bridge – Installation of Wire Gutter and Cable Trays
- November – International Pharmaceuticals Inc – Supply of Labor, Cosumables, Equipment and Survision for the Installation of Water Treatment System
- November – Holy Name University Medical Center Inc. – Assessment and As-Built of the Existing Electrical System and Confirmation / Audit
- January – Knowles Electronics Phils – Supply and Installation of Vinyl Tiles-IQC Re-Layout Project
- January – Knowles Electronics Phils – Installation of IQC-Re-Layout Project
- January – Cebu Mold Technologies Inc. – Generation of Electrical plan with PPE and PME signature
- January – InternationalPharmaceuticalsIncorporated – Install and Supply of Air-conditioning
- January – Teradyne Philippines LTD – Installation of Grounding Testing
- January – International Pharmaceuticals Incorporated – Raw Materials& Packaging Warehouse Permanent Power Supply
- January – Knowles Electronics Phils. – Installation of Additional ACU LVSG Room
- January – Knowles Electronics Phils. Corp – Supply Labor, tools and materials for EDM sinker exhaust system
- February – ZTE Corporation – 2019 Philippines DITO (3rd Telco) Power Line Project
- Cebu Area – 17 Sites
- Lapu-Lapu Area – 12 Sites
- Bohol Area – 21 sites
- Bacolod Area – 19 sites
- March – Terdayne Lmtd – Supply of labor, tools & technical expertise for the conduct of thermal inspection for the plant electrical panel board
- May – Knowles Electronics Phils – Supply labor, tools and materials for rewinding of FCU fan blower unit
- May – Knowles Electronics Phils – Supply labor, tools and materials for 15 HP rotor shaft rebuild of the shaft, re-bearing, broken pulley repair
- May – Knowles Electronics Phils – Supply labor, tools and materials for rewinding of sewer pump,Grundfos 2HP including replacement of bearing, shaft seal, gasket etc.
- June – DepEd Lapu-LapuCity – PM of Air-conditioning Units
- July – DepEd Lapu-Lapu City – Electrical System Upgrade Sta. Rosa National High School
- September – Smart Genset Relocation (Ubay, Bohol)
- September – Smart Genset Relocation (Talibon Bohol)
- October – Smart Genset Relocation (Jagna,Bohol)
- October – Cebu Mold TechnologiesInc – Electrical and Mechanical Plan
- October – Electrical Works (Retail Shop)
- October – Wacu Electrical Works(Tagbilaran, Bohol)
- October – Electrical Piping (Ubay, Bohol)
- October – Proposed Two Story Building DepEd Mandaue Division building(Electrical works & Fire Pro
- November – Electrical Piping (Talibon, Bohol)
- November – Power Upgrade (Bohol Area)
- Ubay
- Talibon
- Jagna
- Tagbilaran
- December – E-formula Technologies Incorporated – Smart New FTK Genset
- Cebu – 4 Sites
- Leyte – 5 Sites
- Bohol – 5 Sites
- January – J.S Unitrade Merchandise Inc. – Docking Bay Repair
- February – Gemphil Technologies Inc. ACU Repair; Conference Room Aircon Unit SplitType Floor Mounted and Production Floor Aircon Unit Split Type Floor Mounted
- February – Two (2) Storey Building-House Repair at Maribago, Lapu-Lapu City
- February – International Pharmaceuticals Incorporated – Proposed Utility Pipings and Fittings of Soaps and Cosmetics Plant
- March – Teradyne Philippines Limited – Thermal Inspection
- March – Gemphil Technologies Inc. – Airconditioning Repair Production Floor Aircon Unit Split Type Floor Mounted
- March – Teradyne Philippines Limited – Preventive Maintenance VFD
- March – Super Manufacturing Inc. – Supply of Labor for the Termination of MV XLPE Sealing-Ends and Power Transformer Low Side LV Cables
- April – CebuMitsumi – PlantWideThermalInspection(ElectricalOnly)
- May – Apex ChungMay Properties Corporation – Supply of Cable,TerminationKits and Accessories
- May – Shiela Tejero – House Renovation – Master’s Bedroom Comfort Room Drain Line Leak Repair
- May – Chinabank Corporate Center JLL – Electrical Infrared Thermographic Inspection
- May – Shiela Tejero – House Renovation – Toilet Bowl Piping Modification,Ceiling Opening and Re-Installation
- May – Knowles Electronics (Philippines) Corporation – Supply and Installation of 3 sets Sewage Pump
- May – Cebu Mold Technologies Inc – Electrical and Mechanical Plan
- May – Knowles Electronics Philippines Corporation – TV Bracket Installation
- May – Knowles Electronics (Philippines) Corporation – Submersible Pump Rewinding
- June – Gemphil Technologies Inc. – Repair of Twisting Machine
- June – DEPED Lapu-Lapu City – Tingo Elementary School (Olanggo Island) School ClassroomsRehabilitation
- July – Teradyne Philippines Limited – Supply and Installation of CHW Pump Breaker
- July – International Pharmaceuticals Incorporated – Supply and Installation of Airline Piping – Soapery Building at IPI-Tingub
- August – International Pharmaceuticals Incorporated – Acu Transfer
- August – Knowles Electronics Philippines. – Supply and Install Phenolic Board
- September – GMR International Airport – Supply and Installation of Board up drywall (terminal 1)
- October – GMR International Airport – Supply and Installation MCCB Breaker
- November – Bellagio 3 Condominium Association – Thermal Scanning of Electrical System for Bellagio 3
- November – CebuMoldTechnologiesInc. – ElectricalSafety Inspection
- December – Knowles Electronics Philis – IQC Re-Layout Project
- December – Brave Divers Resort – Supply and labor off cables and electrical supply
- December – Bellagio 3 Condominium Association Inc – Installation of P.M testing of 2 units 100KVA dry type transformer and 4 units LVSG
- December – Knowles Electronics Phils – 2019-0081 Scanning, Analyzing and Interpreting Beneath Concrete
- December – DEPED Lapu-Lapu City – Marigondon Elementary School (Supplyof Electrical Services)
- December – GMR InternationalAirport – Supply Install of PPR Main WaterLine T1
- December – Teradyne Lmtd Kitchen Equipment Preventive Maintenance and Cleaning
- May – BTCPPMI site #2, MEPZ1 FDASand Water Tank transfer and installation – Under EDZVENConstruction and Supply
- May – Gemphil Technologies: Various of aircon repair under EDZVENConstruction and Supply
- May – DEPED Lapu Lapu. LOOCNHS,PAJO and BANKAL Electrification upgrade by EDZVEN Construction and Supply. Subcon of Golden Hammer Construction and Supply.
- June – Colorado Shipyard – Electrical Thermal Inspection under EDZVEN Construction and Supply
- June – MCIA New Airport Terminal 2 – AHU drain line insulation – Subcon Loreno Construction
- June – LEXMARK: Installation of 4 outdoor and 7 indoor VRVdaikin aircon 70TRby EDZVEN Construction and Supply Subconof Loreno Construction
- June – MCIA Terminal 2: Installation of 5 units chilled water FCU aircon by EDZVEN Construction and Supply Subcon of Loreno Construction
- July – Timex 4 units 2.5MVA transformer DGA and Oil Analysis. Under EDZVEN Construction and Supply subcon of Testech Incorporated
- July – Knowles COOP CR Construction by EDZVEN Construction and Supply subcon of Loreno Construction
- July – CebuMold Technologies, Power system study, Electrical asbuilt, load flow analysis, short circuit and voltage drop
- July – CebuMold Technologies, FDAS Preventive Maintenance.
- July – Manila Water – Supply and installation of pump motors power supply by EDZVEN Construction and Supply
- August – Uni-tech Global Enterprises, Inc. Testing and Commissioning
- August – Knowles Electronics (Philippines) Corporation, Electrical System DesignAnalysis
- September – PEBA Tandem Manufacturing, Inc. – Provision of Safety and Emergency Switch
- September – Golden Hammer Const. and Supply – Supply and installation of Split type Air-condition Units Daikin Brand
- September – Knowles Electronics(Philippines) Corporation Installationo of Printer Room Tool
- September – Cebu Mitsumi Inc. – Preventive Maintenance of Walk-In Freezer at MIC Building 6
- October – HSBC Ayala Project. Subcon of Link Solutions Interfaces Inc. – Supply of Labor, Tools and Safety Equipment
- October – Knowles Electronics (Philippines) Corporation – Repair for the Peavey Mixer
- October – Knowles Electronics (Philippines) Corporation – Knowles Fire Protection Sprinkler System Main Pipe Repair.
- October – QDP Construction – Supply and installationof Split-type Air-condition units
- November – The Thinking Mugs Corporation – Supply of Labor and Materials for Installation of Exhaust Centrifugal Blower
- December – Poblacion,Cordova Barangay Hall – Installation of Comfort Room
- December – Knowles Electronics(Philippines) Corporation – Septic Tank Piping Repair
- December – International Pharmaceuticals Incorporated – Lightning Protection System of IPI Tingub Plant